Services Installation, Commissioning, Training and Technical Support
-
After the Factory Acceptance Test, with the assistance of our engineers, the system is installed, cabled and commissioned in full compliance with industrial guidelines. It is handed over to the customer after successful completion of a Site Acceptance Test (SAT).
-
Installation and cabling
-
Loop tests
-
Commissioning (including system integration, device configuration, and testing)
-
Site Acceptance Test (SAT)
-
Hand-over of as built documentation
-
Training of staff